ABU DHABI: REPORT ON THE 14TH IRENA ASSEMBLY: ANGOLA FACES MAJOR CHALLENGES IN ALLOCATING 2 GW OF AVAILABLE ENERGY
Angola attends the official opening of the 14th Assembly of the International Renewable Energy Agency (IRENA) in the United Arab Emirates
SIGNING OF A MEMORANDUM BETWEEN MINEA AND ELSEWEDY ELECTRIC COMPANY
Ceremony for the Presentation of the Certificate for the De-mined Area Along the Huambo-Lubango 400 KV Transmission Line
The public electricity grid connection for the population of Buraco in Mussulo’s urban district has been finalized
MACAU – CHINA: Energy and Water Minister boosts cooperation efforts during the 15th Macau Forum
The President of the Republic, João Lourenço, inaugurates the Matala Hydroelectric Facility today.
ABU DHABI: DAILY JOURNAL 14TH IRENA ASSEMBLY